PCBC Show
May 30th-June 1st
Booth #6629 North Hall
Moscone Center, San Fransisco
1 Day Epoxy Workshop at Our Facility in the Los Angeles Area
Every other month we will be holding a hands on training class in Los Angeles California where you can view the different systems in one day. You will learn the pros and cons of the different systems as well as why you do not have to do mechanical surface prep on about 90% of your jobs. You will have a hands on demonstration on how to mix and apply Direct to Concrete and 100% Solids Epoxy Chip Floor Coatings, Urethane Floor Coatings and Polyurea Floor coatings.
Systems being installed: Roll On Rock Garage Floor Coating Systems 1 & 2
Polyurea 5000, 5073, Waterbased Urethane 5400 Topcoat Options
CQ Color Quartz 100 Mil Industrial Floor System
Schedule 9AM to 4PM
Tuesday July 24th, 2007
Tuesday August 28th, 2007
TuesdayTBD, 2007
Learn How to Install the Material Professionally,
by a Professional
Education is an understatement of what you receive. We provide an educational experience on an actual job. You will go out with a local contractor to their job and see first hand how the material is installed. This is real world training that will allow you to see all of the variables as they happen out in the field. Following the training session you will then come to our factory for a question and answer period and to tour our facility.
Cost is $500 for up to 2 people from the same company
Liquid Granite
Go out on a job with a contractor who does 10-15 garage floors a week. You will see each step of the process done over several different jobs in 1 day.
Versa-Deck Plus
Go out on a job with a contractor's crew that does 2-4 decks per week. You will see each step of the process done on one job in 2-3 days.
Versa-Crete 1/4-Inch Stamped Concrete
Go out on a job with a contractor's crew that does 1-2 jobs per week. You will see each step of the process done on one job in 2-3 days.
Kwik-Top
Go out on a job with a contractor's crew that does 1-2 jobs per week. You will see each step of the process done on one job in 2-3 days.